Table of Contents
BEST IELTS Academic Writing Task 1, 13th February
ACADEMIC WRITING TASK 1

ACADEMIC WRITING TASK 1
The maps show two different underground tunnel systems for cars in two Australian cites.

SAMPLE ANSWER
The given maps illustrate two different underground tunnel systems for cars in two Australian cites.
Overall, there are a number of differences between the two tunnel systems, in terms of the cost, size, length, time of construction, and the surrounding environment. The first tunnel cost approximately half as much as the second tunnel to construct, however, the first tunnel was significantly smaller in terms of length and vehicle capacity. The first tunnel also took much longer to construct.
The first tunnel, which took twelve years to construct between 1986 and 1998, cost $555 million, and was built underneath a body of water and sand. Meanwhile, the second tunnel only took four years for completion but cost twice as much, at $1.1 billion, and was constructed beneath a layer of stone and clay.
The size of the tunnels was also substantially different, with the first tunnel being 1.5 meters high and 2.2km long, and the second tunnel being 2.5m high and 3.6 km long. The first tunnel system is four lanes wide, while the second tunnel system is six lanes wide.
